Some of the men responsible for the Rover P4

display_5689f27b5a

Production: Mr. W. J. Robinson 

Body Assembly: Mr. R. Dribble

Paint job: Mr. J. Alford.

Trim: Mr. P. W. Hall.

Electrics: Mr. S. Smith.

Chassis Assembly: The late Mr. J. McCutchton,

Finishing Line Foreman: Mr. L Barrow.

Quality Control and Inspection: Mr. C. T. Newsom.

Stores and Material Control: Mr. F. W. Allen.

Works Manager, Tyseley Factories: Mr. A. J. Worster.

Production Manager: Mr. F. C. Holland.

Assembly Superintendent: Mr H. E. Davenport